How We Work

Four steps. Passed the first time.

Nothing about this process is unusual. It is simply followed every time, which turns out to be the rare part.

  1. I

    Load Calculation

    Before anything is quoted we calculate your actual service load per NEC 220. You find out what your panel can carry before you spend a dollar.

  2. II

    Permit & Plan

    We pull the permit, coordinate with Seattle City Light or your utility, and schedule inspection. You never chase a jurisdiction.

  3. III

    Installation

    Master electrician on every job. Circuits mapped, panel directory typed and laminated, work photographed before the walls close.

  4. IV

    Inspection

    We meet the inspector on site. If something needs correcting, it's corrected the same day and you're not billed for it.

Timeline

What a typical project looks like.

  1. Day 0

    Site visit

    One to two hours. We open the panel, trace what we can, and run the demand-load calculation on site.

  2. Day 1–2

    Written proposal

    Fixed scope, fixed price, with the load calculation attached. No allowances, no placeholders.

  3. Week 1

    Permit filed

    We file with your jurisdiction and schedule the utility disconnect where one is required.

  4. Week 2–3

    Installation

    Master electrician on site the entire day. Circuits mapped and photographed before anything closes.

  5. Same week

    Inspection

    We meet the inspector. Corrections are handled that day at our cost.

  6. After

    Documentation

    Typed directory, photo set, permit sign-off, and warranty delivered as one package.

Load Planner

Will your panel carry it?

2,200 sq ft

Current panel size

Existing loads

Planned additions

123A of 100A

123%

This exceeds your service. You'll need a panel or service upgrade first.

  • A 100A service is the constraint here. A 200A upgrade resolves it in one visit.
  • Swapping the electric water heater for a heat pump model frees roughly 14A.

Preliminary estimate. A licensed electrician must perform the full NEC 220 calculation before permitting.

Start with the calculation.

Call the direct line or request an on-site estimate. A master electrician runs the load calculation before anything is quoted.