Right-sized circuit
Continuous-load rated at 125% per NEC 625, not the minimum that happens to fit.
Service 02
We install Level 2 charging the way it should be done: load calculation first, correct conductor sizing, a dedicated circuit, and a clean conduit run. If your service cannot carry the charger, you find out before the work starts, not after.
Scope
What's included
Continuous-load rated at 125% per NEC 625, not the minimum that happens to fit.
Conduit run tight to framing, painted or concealed where it crosses finished space.
We charge your vehicle before we leave and confirm the delivered amperage.
Typical investment
Attached garage, near panel
Under 25 ft of run
$950 – $1,600
Long interior run
25 – 80 ft, finished walls
$1,600 – $2,800
Detached structure
Trench, feeder, and sub-panel
$3,200 – $6,500
Ranges reflect completed Puget Sound projects. Your written quote follows the on-site load calculation.
Questions we get
Also from Northwire
Call the direct line or request an on-site estimate. A master electrician runs the load calculation before anything is quoted.